  1. STEP 01 / 08

    Submit your files

    Send 3D and 2D files with material, finish and quantity. For the most accurate quote, send both a 3D STEP and a 2D PDF with tolerances: 3D only is machined to ISO 2768-m general tolerance, 2D only is priced as an estimate until we receive the model. Files are kept confidential; NDA on request.

  2. STEP 02 / 08

    Specify requirements

    Confirm quantity, material, tolerances and finishes. We can quote multiple options on request.

  3. STEP 03 / 08within 48 h

    Review quotation

    You receive a detailed, line-item quote with lead time, typically within 48 hours. Have a target price? Include it — quotes converge faster, and if it’s within reach we’ll often just meet it.

    Request a quote
  4. STEP 04 / 08

    Confirm & lock in lead time

    Quotes are valid for 30 days. Payment is a 50% deposit, with the balance before shipment. First orders are paid with a deposit up front; once we have an order history together, more flexible terms can be agreed. Lead time typically starts when the deposit is received, and we confirm the schedule with you.

  5. STEP 05 / 081–3 days

    Engineering support & DFM

    Once your deposit is in, DFM feedback on geometry, tolerances and material cuts cost and risk before machining begins, and we keep confirming specs with you as the job runs.

  6. STEP 06 / 08~10 business days

    Sampling & approval

    On request, we produce samples for your approval. Samples are charged separately, typically about ten business days.

    Inspector running a CMM measurement program
  7. STEP 07 / 08

    Manufacturing

    Material traceability, precision machining, in-process QC, finishing and packaging, with progress updates throughout.

    Your print is the spec, not a suggestion.Anything unclear on your print is confirmed with you by email during production. We don't pick the easiest interpretation.

    5-axis CNC machining center milling an aluminum part
  8. STEP 08 / 08

    Shipping & logistics

    Protective packaging and worldwide shipment by air, rail or sea, DDP available for selected destinations.

    Request a quote
    Export crate with foam-packed CNC parts ready for shipment

Ready for step 1? Send your STEP and PDF files.

A line-item quote with lead time comes back by email.

Inside production

What steps 7 and 8 look like on the floor

Your parts are machined, inspected and packed in our own plant in Suzhou, by a third-generation family business founded in 1994.

CNC machines (100+ machine tools in total)
97
Production floor, on a 10,000 m² site
7,600 m²
Founded; a third-generation family business
1994
of our 102 staff work in quality
12
Row of 3-axis CNC milling machines on the Fenva production floor
MILLINGRow of 3-axis CNC milling machines on the production floor
High-speed CNC machining centers along the production aisle at Fenva Precision
MILLINGHigh-speed CNC machining centers along the production aisle
CNC turning cell machining automotive components at Fenva Precision
TURNINGCNC turning cell machining automotive components
Automatic tool changer and spindle inside a CNC machining center
SETUPAutomatic tool changer and spindle inside a machining center
Bridge CMM with a part fixtured on the granite table
INSPECTIONBridge CMM with a part fixtured on the granite table
Machined part on the VMM glass stage
INSPECTIONMachined part on the VMM glass stage
A batch of turned aluminum rings in its own Fengfan bin
TRACEABILITYA batch of turned aluminum rings kept in its own bin
Foam-packed CNC parts with inspection paperwork, ready for shipment
PACKINGFoam-packed parts with inspection paperwork, ready to ship

What you get with every order

  • Photos of your parts before they ship.
  • The inspection report for your order.
  • Unclear print points confirmed by email with you during production, never guessed.
  • Nonconforming parts remade at our cost.
  • Traceable material: all raw material arrives with an MTC and is tracked to your batch; EN 10204 3.1 certificates on request.
See a sample inspection report (PDF) →

How your parts are inspected

  1. 01First article checked before the run
  2. 02In-process checks at the machine
  3. 03Final inspection to our standard sampling plan, included in every quoted price

Measured on CMM and VMM in a dedicated quality lab. CMM and FAI reports on request.

Tour the full facility →
A machined part being measured on the CMM in Fenva's inspection lab

Factory-direct pricing

Cut the markup, not the accountability.

You're talking to the factory, not a broker.

You deal with the factory that machines and inspects your parts.

  • The same contact from quote to delivery, no hand-offs
  • FAI and CMM/VMM reports; sampling plan published
  • DDP to the US, UK and Europe on qualifying orders

Shipping & logistics

Choose the speed that fits your program

Transit times are typical ranges and vary by destination and customs. We'll confirm options and cost with your quote.

Typical transit times by method
MethodTransit timeNotes
Air freight7–12 daysFastest option · FedEx or DHL
Railway25–35 daysAsia & Europe
Sea freight39–65 daysMost economical
DDPOn requestAvailable for selected destinations

Example: a prototype order typically takes 10–15 business days to make, plus about 7–12 days by air.

DDP (Delivered Duty Paid) means we handle freight, duties and customs to your door where available.

Grid of precision CNC-machined production parts at Fenva Precision

Get started

Ready to start your order?

Upload your STEP and PDF files and our engineering team will quote within 48 hours. No MOQ.

Your drawings stay confidential. Request an NDA
Upload your files STEP + PDF per part. A STEP and a PDF with the same name are paired into one part on the quote form. Start your quote